Things are coming along really well on the house. While we were in California the trim caprenter was working on the house. I was surpised when we got a call the day after Christmas and the trip carpenter was working. Yesterday he finished his work. All the cabinets are installed, the interiors doors are in, the closets are complete, the crown molding and the base boards are done, and the stair railing and fire mantle are up. There was a lot of things that the trim carpenter had to do and we are really pleased with his work. The pictures are the ones we took before he was done, so we don't have pictures of the the fire mantle and some of the other things he completed. The septic sytstem was also installed within the last couple of weeks. We now have all utilities running to the house. Today after school we went out to the land to clean up so the painters can start their work tomorrow. The porches and driveway are to be poured on Monday. This past week we have made our final major decisions for the house, the hardware and the lighting. The lighting was my least favorite thing to do. No completion date set yet, but it will be here before we know it. Yeah!
Thursday, January 10, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
I hope Craig isn't losing a lot of weight so I will have 50 extra bucks to buy you a house warmng gift. Probably buy you an ant farm or something. :)
Scott
Post a Comment